Skip to content

BankStar Volga – Water Runoff Models

August 20, 2023

Ortho pre cons Ortho WO DSM photo

Pre-Construction to progress as of August 20, 2023

Ortho WO DSM photo DSM Photo

August 20th Ortho Photo to Digital Surface Model

DSM Photo DSM with Contours
DSM Photo DSM with Contours

Digital Surface Model to Contour. Contour intervals are ~10 inches.

Water Runoff Photo

Summary Diagram indicates water runoff and pooling of water after rainfall or snow melt. Diagram useful when staging stockpiles, construction materials and equipment.

Water Runoff Diagrams for Nov. 29

Digital Surface Model Report

This image has an empty alt attribute; its file name is Separator.jpg
Fire Station PreConstruction photo scaled Fire Station Nov 29 Ortho scaled

Pre-Construction to progress as of Nov. 29

Nov. 29 Ortho Photos with Digital Surface Model

Digital Surface Model overlaid with Contour. Contour intervals are 10 inches.